the space and economical location requirements for the HVAC system should be considered early in the design process.
The location of air-handling units will have a major impact on design. Main distribution piping should be run in or above non-critical spaces. Consideration should be given to the possibility of future building expansion and equipment additions. Such flexibility is highly recommended.