As per my reviewed, minor comments for the main report were found as my comments in the reviewed version that some comments from the first review was not rectified. Keys comments are below;
1) Sound level monitoring frequency shall be once a year but JV has proposed 2 times annually as in the final report. But if your contractor will conduct more than OPEMMP proposed, it can propose as final report
2) Please check the risk assessment results to be related with proposed MMP (Appendix 3) and comply with OPEMMP
- Hazardous material and fire hazard for survey activity including the chemical storage for this activity, if not please consider to move both hazard and mitigation control to the workshop / maintenance works or whatever which related with this hazard.
- The respiratory hazard of survey activity was mentioned for the chemical substances, please consider on this matter. The respiratory hazard may from dust dispersion in mine area during survey.
It should be considered to mention the mitigation for dust control.
- Biological hazard was mentioned to the waste feeding to incinerator which I have asked to review and consider since previous reviewed. Please confirm if your contractor has confirmed to keep the this topic (waste feeding to incinerator) cause they will have this activity in the future. If the incinerator will be used by JV, please consider for the risk assessment and mitigation measures (including monitoring program) as appropriately.