4. What type of material to use at the end of vertical stack joint with horizontal pipe discharge at 5th floor? We worry the end of stack may not be able to withstand the gravity water drop pressure. In Malaysia, we introduce S-Bend for every 8 floor, to reduce this pressure. Alternatively, all joint fittings to main horizontal pipe like elbow, tee, etc shall use cast iron type at this floor.