Dear K.warawit, this morning CDTE Mr.Luo turbine engineer inform me that last night NPS operation team start ruining the cooling water system, and most water go into condenser while the condenser are doing the statics water leakage test , and the No.2 bearing already fall down about 0.08 mm duo to overload of condenser. After condenser finish leakage test, CDTE shall drain out the demin water, and shall check the gap again , supported that the gap can not be reserved to original data, CDTE shall adjust the LP central line again.above just for your information .this is not good for unit start.