Enclosed is the updated layout per our last meeting.
Please send to Kankanok for review/approval.
Please ask them to sign and return/ Thank you.
Some comments to the layout;
1. One set cable guide rollers have been added before the spark tester, there are also guide rollers in the RW unit to the left of the spark tester that will hold the cable in place after the spark tester. The spark tester stand is just an indication and not final design of how to move the spark tester in and out if not needed.
2. We have ~ 1 m after printer to the next horizontal cable guide roller for the take-up.
3. The cable guide for the take-up will be added with guide rollers that can be moved close to the reel during winding. This is not final design and just for indication that we will update the cable guide design.
4. The smaller rewind line will be exactly the same expect for a slightly smaller take up. Once the enclosed layout is signed we will send a new layout for the smaller rewind line.