ฺAll Temporary work shall be properly designed and suitably constructed to carry such loads as will be imposed on them. Subcontractor shall submit for the review of contractor its drawings and calculations relating to the strength and stability of any temporary work as well as to the methods proposed for the erection thereof, if requested to do so.