The stabling tracks from S5 to S10 will be fully equipped. Besides the exterior cleaning of trains by TWP, light interior cleaning tasks will be carried out at the stabling yard for the returned trains from the Main Line. Nevertheless, intensive interior cleaning works shall be carried out inside the MWS.