The Workshop Loading module uses a calendar to create the Loading pages in Point of Sale and determine non-productive days.
These calendars will need to be created on a yearly basis and it is advisable to have in place about 15 weeks before the end of the year.
This ensures that any system down time, due to workshop daemons not running because of illegal calendar types is kept to a minimum.
The easiest way to determine which calendars are being used is by checking the resource groups:
•From Master Menu select Workshop Loading.
•Select Resource group maintenance from Workshop Loading menu
Select a resource group from the drop down box and note the Calendar code displayed. Check for all resource groups