The scheme KT2-PH1 consists of a dam KT2 of about 80 m height, an about 2,450 m long power waterway and the powerhouse at downstream of Keng Luang. It is proposed with 51.7 MW installed capacity operated under 78.1 m average net head and 75.8 m3/s design discharge. The plant can generate about 201.83 GWh energy.