• 11 outfalls discharge to 4 different
local streams
• Stormwater controls constructed
2006
• 11 flow control facilities providing
113 acre‐feet of storage
• Water quality treatment includes
source controls, swales, filter strips,
media filtration, wet pools
• Total cost: $60,000,000