In Figure 2.1:
• C(N) is the cost of moving from level Nm (the "natural" level) to level N;
• D(N) is the amount the individual is willing to pay to move from level N to level 0;
• T(N) = C(N)+D(N) is the total cost to the individual concerned, which is a minimum
when N = N0.