Important differences in the severity of pollution between sites can be detected by measuring the leakage current. In some sites, the severity of pollution can cause high leakage current activity in a short time, whereas in others, a longer time is needed and monitoring at different sites is necessary to determine the best insulator profile for each site. With the selection of the best insulator profile for each site, maintenance can be scheduled accordingly, thereby minimizing pollution flash over outages.