reference points, triangulation points, bench-marks and other surveyor's boundary marks of any kind shall be protected by subcontractor and may not be removed from their positions with out permission from contractor nor shall work be carried on so near to them that risk of disturbance may arise. Instructions given by contractor must be obeyed unconditionally and the replacing of disturbed or temporarily removed marks, etc. must be effected without delay.