pulled with a tensile strength of up to 70%. Before pouring concrete You can get loads at 200 - 1950 kg per square meter. (Based on the number and length of wire, sheet).
pulled with a tensile strength of up to 70%. Before pouring concreteYou can get loads at 200 - 1950 kg per square meter. (Based on the number and length of wire, sheet).