The accuracy requirement defines the 95% Total System Error (TSE) for those dimensions where an accuracy requirement is specified. The accuracy requirement is harmonised with the RNAV navigation specifications and is always equal to the accuracy value. A unique aspect of the RNP navigation specifications is that the accuracy is one of the performance characteristics that is monitored.