.4 Perform Weekly Maintenance Protocol
Performing the weekly maintenance will clean the fluidic lines and help ensure proper system performance.
1. Insert a maintenance chip (the maintenance chip does not require temperature equilibration).
2. Prior to running the weekly maintenance, flush system with Distilled or Deionized Water for 10 minutes.
3. From ProteOn Manager instrument maintenance screen, select the Weekly button..