Table 8.1 indicates the total project cost of the Cogeneration Project,” given a 24 month construction drawdown schedule and an interest rate of 10 percent. Interest is paid on funds that are drawn down, and a commitment fee is charged on the unused balance of the commitment. The loan commitment is designed to accommodate higher interest rates during the construction period and higher construction costs (for example, to cover design changes).