After discussion with fluke, there were changes on the schedules from the original you sent to me. Please find below the changes:
1. 1.2 Software Installation will be swapped to 2.1 System Design Sept 12-13 and Sept 14-15 respectively.
2. 3.1 System build same as scheduled
3. 4.3 User acceptance testing and fine-tuning (Interface with other Systems -Opera & MC) same as scheduled
4. 4.4 Live Operation will be moved to Nov.1-3
5. First month end will be moved to Dec 1-3
And all other schedules same as is which are not mentioned above.