Process loads are modeled differently in the baseline and proposed case. Please revise the process loads to be identical in the baseline and proposed case, as required by LEED and ASHRAE Appendix G modeling protocol. Please then model any process energy efficiency measures using the Exceptional Calculation methodology. A narrative should describe all Baseline and Proposed case assumptions included for these measures, and the calculation methodologies used to determine the projected savings. The narrative and energy savings for each exceptional calculation method should be reported separately from the other efficiency measures in the LEED Template, Section 1.7. A supporting narrative should be uploaded if there are more than one exceptional calculations, or if the space in the template is insufficient to adequately describe the measures. Please be sure to provide sufficient justification to verify that these measures are not standard practice for the project type listed, to justify the baseline comparison used, and to document that any reported savings have been calculated accurately.