2. INSTALLATION
All Oliver Maxi-Caps are operated on test blocks at the factory for a minimum of fifty-hours to check for bad
bearings, false vibrations or other potential operational problems. During and after operation, the drive train
and controls are checked to insure that they will operate satisfactorily.