1. Particle size distribution on the basis of slurry preparation, transportation and utilization costs.
2. Slurry concentration on the basis of transportation and dewatering cost.
3. Pipeline diameter on the basis of pumping power costs.
4. Pipe thickness and number of pumping stations on the basis of operational constraints