As mentioned above, voltage is a local condition. The PMS
will therefore measure voltage levels at different parts of the
plant in order to determine the reactive power requirements.
At each location where voltage control is possible, the PMS
will determine the required set point changes for generators
and send them. Reactive power sharing among generators
connected to the same busbar will be integrated into the set
point changes calculated by the PMS.