All right,now you have to dig out the ditch for the waste water connection
for the building extension.
Return the excavatorto the construction site.
Dig out the marked area and load the excavated material into
the dumperor dump it off on a free area on the construction site.
You can bring the full dumper to the gravel pit and unload it there.