1. Will comply with the EPC Safety Plan, the Contrac, and all Lao Peoples’ Democratic Republic legislation applicable to the work.
2. Will submit construction method statement including health and safety procedure to EPC for review and consent before any work commences.
3. Will comply with approved method statements and any EPC document provide in the interests of safety.
4. Will ensure that all of their personnel who are to work on any Xayaburi Hydroelectric Development Project site or location are properly trained and competent.
5. Will ensure that all personal who are to work on the Project received EPC health and safety induction training, before commencing work on any Project site.
6. Will ensure that all plant and equipment brought onto sites has been inspected and serviced in accordance with legal requirements and the manufacturers or suppliers instructions.
7. Will provide details of any hazardous substances to be brought onto any Project site.
8. Will ensure that all of their personal including any visitors are issued with and use,suitable personal protective equipment (PPE).
9. Will request permission from before any EPC visitors access any Project site or locations and ensure that all visitor are accompanied at all times.
10. Will comply with all instructions regarding health, safety and loss control given by EPC.
11. CH.Karnchang provider main first –aid infront of camp 1 near market, and damsite first-aid behide gas station 05 left bank at Luang Pha Bang stand- by doctor,nurse and appropriate medicines in case of emergency,in cluding 2 ambulances.
12. In case of injuly by any accidents at construction area, rescue team available immediately support for any accident case.
13. Nessessary facilities (Such as, canteen, drinkging water,water closet.(W.C) available on site
14. Before start work every
o CH.Karnchang safety section and SA-2 safety Co-ordinator will give moring talk once a week.
o All workkers must be wear basic PPE (hart hat, visible jacket,safety shoes/ rubber boot, and any PPE appropriate to work done.
o Will checked all tools, electric equipments before daily work in a safe manner.
o All workers will be inspect and check working place in a safe condition to prevent any accident occurred.
1. Will comply with the EPC Safety Plan, the Contrac, and all Lao Peoples’ Democratic Republic legislation applicable to the work.2. Will submit construction method statement including health and safety procedure to EPC for review and consent before any work commences.3. Will comply with approved method statements and any EPC document provide in the interests of safety.4. Will ensure that all of their personnel who are to work on any Xayaburi Hydroelectric Development Project site or location are properly trained and competent.5. Will ensure that all personal who are to work on the Project received EPC health and safety induction training, before commencing work on any Project site.6. Will ensure that all plant and equipment brought onto sites has been inspected and serviced in accordance with legal requirements and the manufacturers or suppliers instructions.7. Will provide details of any hazardous substances to be brought onto any Project site.8. Will ensure that all of their personal including any visitors are issued with and use,suitable personal protective equipment (PPE).9. Will request permission from before any EPC visitors access any Project site or locations and ensure that all visitor are accompanied at all times.10. Will comply with all instructions regarding health, safety and loss control given by EPC. 11. CH.Karnchang provider main first –aid infront of camp 1 near market, and damsite first-aid behide gas station 05 left bank at Luang Pha Bang stand- by doctor,nurse and appropriate medicines in case of emergency,in cluding 2 ambulances.12. In case of injuly by any accidents at construction area, rescue team available immediately support for any accident case.
13. Nessessary facilities (Such as, canteen, drinkging water,water closet.(W.C) available on site
14. Before start work every
o CH.Karnchang safety section and SA-2 safety Co-ordinator will give moring talk once a week.
o All workkers must be wear basic PPE (hart hat, visible jacket,safety shoes/ rubber boot, and any PPE appropriate to work done.
o Will checked all tools, electric equipments before daily work in a safe manner.
o All workers will be inspect and check working place in a safe condition to prevent any accident occurred.