1) Check & Review the surrounding conditions through site visit
2) Check and review of our basic plan(RSS Factory Building Layout Plan) and proper comment with your recommended optimized plan to achieve grade 1-2 (“Target”), if any.
3) Provide a) advisory services to, and/or b) propose, the basic plan for the production line including process flow diagram, equipment list with specifications and recommendable/qualified vendor/engineering company list to achieve Target.
4) Provide basic documents for operation such as a) operation manual, b) QA/QC program, c) Manufacturer’s product specification(classification equivalent to STR) standard and Inspection procedure, etc.
5) Supervisory services during construction and commissioning period (part time/periodically)
6) Training local labors for appropriate operation at initial start-up period(say for 2 weeks)