5. Place the gasket correctly on the boiler and locate the flue adaptor over this, fixing
it in position using the nuts and bolts provided. For the low level flue side outlet
options on white case boilers it will be necessary to manoeuvre the adaptor through
the side panel before fixing it to the boiler after the blanking plate has been removed.
Push boiler into position against the wall.