Dear all,
To be clear:
Until the certificate received has the actual drawing included, we reject the validity of the certificate and we should not load anything into the racks.
How to proceed:
1. Polyplex is responsible for the construction of the racks.
2. Polyplex is responsible for providing the valid certificate of the racks.
3. Polyplex should talk to TTC themselves and get the actual drawing and related certificate.
Until they do this and send us an updated cert we are happy with, there should be no rack loading.
Rgds
Johan