This project presents the design of a piece of broken PCS Machine (Thailand) CO.LTD current state of the system to mark the workpiece. How to write a bill for the two cards one piece, and when finished one slot to put the pieces all waste bag with billing and cost to complete the system which processes will allow. the problem is When the bill was not attached to the work piece makes some employees may forget or do. Blown away or damaged by the oil. And writing a report on the work of two pieces that first time without losing benefits. The trial was conducted and data were analyzed using the theoretical diagram cause and effect (Fish Bone Diagram) and is linked to the solution process quality (QC Story) made aware of the real cause of the negligence of staff and materials. the statement made that the experimental work was to design and improve the system of marking material waste. The strap design work with input sensitive data. Divided by color and type of problem. You can see clearly and stick to the workpiece. The straps are made of PVC material used Uni Paint Marker pen writing can be removed by using thinner. This strap can be broken down to write statements for the first notification of loss, damage and reduce waste as well