Prior to night work commencing shall ensure the following:
Work is planned as far as practicable to limit the need for night work.
The Subcontractor’s and MM SHE Manager are properly notified of the work and they agree that all necessary precautions have been properly planned.
All required precautions specified in this procedure or those agreed with the respective SHE Manager are implemented.
Coordination of radiography activities; ensure that signs, barriers, adequate lighting, and flashing lights are provide; verify that the relevant persons have been informed.
Provision of instructions in regard to the movement of vehicles [concrete trucks] within the areas of work.
Adequate barriers are provided around areas where hazards may exist, and that such hazards are clearly lit. [Flashing lights]
Lighting provided is adequate [pet the table] and that personnel are not working in the shadows.
JHA’s and JSA’s have been completed as required by the nature of the work.
Adequate medical coverage is in place during work activities.
All necessary tools and equipment are provided and that personnel access routes to the tools are illuminated in accordance with this procedure.
Regular inspection and maintenance of lighting equipment takes place.
All lighting equipment installed has been checked and certified in accordance with project requirements.
Cables and other material are located in a way that prevents trip hazards.
Public access to work areas is restricted to the extent possible.
• Authorization from the SM or his designee to work beyond normal working hours is obtained.
• Employees are provided with suitable and sufficient personal protective equipment.
• There is a First Aid Attendant(s) present when working at night