Two beels were selected for this study. One is East Beel
Khuksia (EBK) where TRM has fully operational; and another
is Beel Kapalia (BK), where TRM is still being established.
The methodologies followed in the study can be divided into
four steps; 1) Selection of sediment management options 2)
Assessment of technical feasibility of the options 3) Economic
analysis of the options and 4) Finalization of option(s).