The small signal stability analysis and voltage stability
analysis are to be done in the Central Travancore grid in
As a STATCOM is added to the Central Travancore grid the
maximum loading point has improved. In the normal system
the maximum loading point was only 1.4 p.u. but on adding
the STATCOM to the system it has been improved to 1.6 pu
as seen in P-V curve in figure 10.