As discussed with Khun Anuparp on location of left head reservoir location and excavation work.
CHK intend to minimize excavation work and located the left head reservoir on the existing temporary detour road to B. Pa Sak as shown in attached drawing. As well, water treatment and water supply storage, firefighting storage for the Permanent camp will be located on this road. This road will use as access for maintenance of the mention buildings. So, this road shall be fully secured.
So, the road to Ban Pa Sak shall find other route separate from existing road.
But as discussed with Khun Anuparp, it is understand that the road to B. Pa Sak was not in anybody scope of work. And XPCL have an idea to take this road as road to B. Pa Sak.
We, already discussed this matter to Khun Anuparp at site, but, there is no clear answer.
Could you please advise what is your idea?