This could be attributed to the set ramp heating program in the pyrolysis stage which minimizes the temperature difference between the platform and tube wall. Therefore, the pyrolysis temperature of 400 °C with ramp time of 10 s and holding time of 10 s was chosen as the compromise conditions for both platform and wall vaporization fluorination assisted ETV–ICP-MS determination of the target analytes.