1. Conceptual estimates in the planning stage (typically referred to as predesign estimate or approximate estimate)
2. Preliminary estimate in the design stage (often termed budget estimate or definitive estimate)
3. Detailed estimate for the final assessment of costs
4. As-built cost estimate that incorporates any cost overruns or underruns