22. Road/Rail Shunter
Where is the area that Road/Rail Shunter is permitted to operate? (1 Point)
a) Train Washing Plant.
b) Stabling area and P_way.
c) Main Workshop and P_way.
d) Main Workshop and Stabling area.
e) Must only be operated within the area of Main Workshop and on Underfloor Wheel Lathe Track (W9) only.
not satisfied.