Minimize impacts on Surface water quality/ effluent discharge by Land clearing, excavation, soil/ material hauling and dumping.
Excavated soil, material hauling and dumping will be piled only in the construction sites to prevent leaching into the nearby water resources;
Construction work camps will be located at least 50 metres from the waterway outside of stream bank;
Areas used for embankment materials will be immediately rehabilitated following the completion of works (i.e. surface vegetation and use of fast growing tree species); and