Site control and management for Mechanical erection, installation,
maintenance ,work planning and scheduling as following,
• Gas Turbine and Generator Frame 6(3x 4.2 MW) (GE) erection
• Gas Turbine (GE) and Generator installation and alignment work.
• Air Inlet filters house installation work.
- Structure erection work.
- Inlet duct assembly.
• Gas Turbine auxiliary equipment installation
- Installation of fuel gas valve skid.
- Installation of steam injection skid.
- Installation fuel gas scrubber skid.
- Control cabin skid.
- CO2 bottle skid.