WORK EXPERIENCE
May – June 2015 Research assistant at Rayong. (Part-time)
February – April 2015 Special problems (Increasing Efficiency and Improving Heat Sink
Production Process by Using Lean Concept)
• Created the “Process Mapping Activities” and “Value Stream Mapping” (Analyze the value of activity and identify the deficiency of production process).
• Analyzed the 7 wastes and find the way to eliminate.
• Calculated the Cycle Time/ Takt Time/ Picth Time.
Seminar (Driving Down the Transport Costs)
• Design director: Create the backdrop, PR poster, made the video presentation, and prepare the site.
• Photographer.