During drilling the jack-ups act like fixed platforms. However, the water depth of about 150 m limits their operations to shallow-to-moderate water depths, Jack-up units have other constraints, such as being largely affected by the seafloor terrain and material characteristics and the time and environmental constraints associated with jacking operations