the Channel Tunnel was built by two teams digging from both sides of the Channel.the work was started in1987 and both teams raced to reach the midle of the tunnel first.They used huge machines,call'borer',which could dig 75 meters a day.The amount of rock and dirt dirt removed by these machines increased the size of Britain by 36 hectares!