This study applies a heuristic model to determined two independent paths from an earthquake area to each shelter for vehicle flow allocation in an earthquake transportation network, considering both travelling time and capacity of the transportation network as parameterfor network analysis. Routes to different shelters cannot present intersection points either in order to allow continuous traffic flow and reduce potential accidents.