A major portion of the project work takes place—both physical and mental.
The physical product is produced (a bridge, a report, a software program). Time, cost, and specification measures are used for control.
Is the project on schedule, on budget, and meeting specifications?
What are the forecasts of each of these measures?
What revisions/changes are necessary?