A Beam Stop Control requires termination of all operations
A Temporary Barrier is Required whenever Removal of Panels, Protective Housing, or the Overriding Interlocks (during maintenance/service) and Laser Radiation May Exceed Maximum Permissible Exposure Level
Notice Signs are Required to be Posted Outside the Temporary Barrier to Warn of Potential Hazards