dditional CCTV - Stef: to be built as per the quantity if everyone agrees with the diagram above
a. Cable RC. 6 at 80 Meter.
b. Computer plug 5 units,
c. UDD cable 150 meter.
d. Pipe ENT 100 meter,
2. Additional Fire alarm, - not IT related
3. Additional Emergency light, - not IT related
4. Additional Exhaust fan, 4 units both wall, and celling,: our server room needs alternating Airconditioning. BPU needs to be calculated prior to deploying the aircond, need to know the size of server, heat exposure, wall material etc…normally, 2HP*2 for a small size server room.
a. Additional THW cable 10 meter,
b. Pipe ENT 10 Meter.
c. Plug 4 units,
my add ons:
1. IT server and hub rooms should have their power separated from the normal utilities
2. Conduit size, min 20cm diameter
3. Power for cubicle– 1 unit has to be universal
If there’s a cabling vendor appointed on SLB end, he should be looped in this mail.
Do contact me if you have any questions.
Regards,
Stefanie
dditional CCTV - Stef: to be built as per the quantity if everyone agrees with the diagram abovea. Cable RC. 6 at 80 Meter.b. Computer plug 5 units,c. UDD cable 150 meter.d. Pipe ENT 100 meter,2. Additional Fire alarm, - not IT related3. Additional Emergency light, - not IT related4. Additional Exhaust fan, 4 units both wall, and celling,: our server room needs alternating Airconditioning. BPU needs to be calculated prior to deploying the aircond, need to know the size of server, heat exposure, wall material etc…normally, 2HP*2 for a small size server room.a. Additional THW cable 10 meter,b. Pipe ENT 10 Meter.c. Plug 4 units, my add ons:1. IT server and hub rooms should have their power separated from the normal utilities2. Conduit size, min 20cm diameter3. Power for cubicle– 1 unit has to be universal If there’s a cabling vendor appointed on SLB end, he should be looped in this mail. Do contact me if you have any questions.Regards,Stefanie