Dear All,
As a part of Multi-skilling and creating more pool of skilled personal we are doing 1st phase job rotation in PPC which will be effective from 1st of Sep-2014.
A) Mr. Nirut :
In addition to existing responsibility he has been given additional planning responsibility of WET planner. He will do entire planning for Fine
cord wire
feeding from WET and as a part of that we are allocating 22 WET machine exclusively for Fine cord (Refer attachment). We are allocating 11
machine for Ropery
& Wire products (Spring/Prym/TESAC/Paper clip ) and Job will be planned by Mr.Nont and will give details to Mr.Nirut. Mr.Nirut will be
responsible for
releasing both Fine cord & WET load sheet & Work plan. His leave coverage will be done by Mr.Wipat for Fine cord & Mr.Nont for WET.
B) Mr.Nont :
He will be the full time planner of Wire mill dry & Furnace. He will be responsible for planning in-coordination with Production for entire Dry machines &
Furnace , releasing load sheet, Preparing HCW for entire WET machines.
He will be assisted by Mr.Udomsak apart from his CBMS responsibility. His leave will be
covered by Mr.Pateep.
C) Mr.Pateep :
Being the PPC in-charge he will guide and help Mr.Nont & Mr.Nirut as & when required. All other existing responsibilities of Mr.Pateep remains the same. His
role of Key co-ordinator among Ropery,Finecord, Furnace, Wire mill , Sales/marketing, dispatch , HR , IE & Material management etc remains unchanged.
There is no change in other Key functionaries of PPC , Material management , IE & TPM , CBMS in 1st phase.
Requesting your co-operation for this smooth transition and the necessary overlapping jobs by Mr.Nont & Mr.Nirut have already completed 2 weeks.
Dear All,
As a part of Multi-skilling and creating more pool of skilled personal we are doing 1st phase job rotation in PPC which will be effective from 1st of Sep-2014.
A) Mr. Nirut :
In addition to existing responsibility he has been given additional planning responsibility of WET planner. He will do entire planning for Fine
cord wire
feeding from WET and as a part of that we are allocating 22 WET machine exclusively for Fine cord (Refer attachment). We are allocating 11
machine for Ropery
& Wire products (Spring/Prym/TESAC/Paper clip ) and Job will be planned by Mr.Nont and will give details to Mr.Nirut. Mr.Nirut will be
responsible for
releasing both Fine cord & WET load sheet & Work plan. His leave coverage will be done by Mr.Wipat for Fine cord & Mr.Nont for WET.
B) Mr.Nont :
He will be the full time planner of Wire mill dry & Furnace. He will be responsible for planning in-coordination with Production for entire Dry machines &
Furnace , releasing load sheet, Preparing HCW for entire WET machines.
He will be assisted by Mr.Udomsak apart from his CBMS responsibility. His leave will be
covered by Mr.Pateep.
C) Mr.Pateep :
Being the PPC in-charge he will guide and help Mr.Nont & Mr.Nirut as & when required. All other existing responsibilities of Mr.Pateep remains the same. His
role of Key co-ordinator among Ropery,Finecord, Furnace, Wire mill , Sales/marketing, dispatch , HR , IE & Material management etc remains unchanged.
There is no change in other Key functionaries of PPC , Material management , IE & TPM , CBMS in 1st phase.
Requesting your co-operation for this smooth transition and the necessary overlapping jobs by Mr.Nont & Mr.Nirut have already completed 2 weeks.
การแปล กรุณารอสักครู่..
ที่รักทุกคน
เป็นส่วนหนึ่งของหลาย skilling และสร้างสระว่ายน้ำที่มีทักษะส่วนบุคคลมากขึ้นเราอยู่เฟส 1 งานหมุนใน PPC ซึ่งจะมีผลตั้งแต่วันที่ 1 sep-2014
) คุณนิรุตน์ :
นอกจากที่มีอยู่ในความรับผิดชอบเขาได้รับความรับผิดชอบวางแผนเพิ่มเติมของการวางแผนที่เปียก เขาจะต้องวางแผนทั้งลวดสายไฟดี
อาหารจากเปียกและส่วนที่เราจะจัดสรร 22 เปียกเครื่องเฉพาะสำหรับปรับสาย ( ดูเอกสารแนบ ) เราจัดสรร 11
เครื่องโรงทำเชือก
ผลิตภัณฑ์ลวด& ( ฤดูใบไม้ผลิ / prym / tesac / กระดาษคลิป ) และงานจะถูกวางแผนโดยนายดร และจะให้รายละเอียด mr.nirut . คุณนิรุตน์จะ
ปล่อยรับผิดชอบปรับทั้งสาย&เปียกโหลดแผ่น&งานแผนความคุ้มครองจากของเขาจะทำโดยคุณ wipat เพื่อปรับสาย&คุณดร เปียก
b ) คุณดร :
เขาจะเต็มเวลาวางแผนลวดโรงสีบริการ&เตา เขาจะรับผิดชอบการวางแผน ประสานงานในการผลิตทั้งเครื่องจักร บริการ&
เตา การโหลดแผ่น เตรียม hcw สำหรับเครื่องเปียกทั้งหมด .
เขาจะช่วย โดย นายอุดมศักดิ์ นอกเหนือจากที่เขามอบให้ ความรับผิดชอบทิ้งจะถูกปกคลุมด้วย mr.pateep
. นายปทีป :
c )
เป็น PPC ในค่าใช้จ่ายเขาจะแนะนำและช่วยคุณ ดร &คุณนิรุตน์เป็น&เมื่อจำเป็น ทั้งหมดอื่น ๆที่มีอยู่ในความรับผิดชอบของ นายปทีป ยังเหมือนเดิม บทบาทของกฎหมายที่สำคัญของเขาใน finecord โรงทำเชือก Co , , เตา , ลวดโรงสี , ขาย / การตลาด , ส่ง , HR , IE &วัสดุ การจัดการ ฯลฯ ยังคงไม่เปลี่ยนแปลง
ไม่มีการเปลี่ยนแปลงใน functionaries หลักอื่น ๆของ PPC , การจัดการวัสดุ , IE & TPM , มอบให้ในระยะที่ 1
ขอความร่วมมือของคุณนี้ราบรื่น และจำเป็นที่ทับซ้อนกัน งาน โดย นายดร &คุณนิรุตน์ได้เสร็จสิ้นแล้ว 2 สัปดาห์
การแปล กรุณารอสักครู่..