After the cleaning operation, and at least 12 hours after the process, the drill hole should be pumped continuously for 3 hours in three periods of one hour each, at respective flow rates of 0.5; 1 and 2 m3 / hour. Before and during the pumping, the static and dynamic levels are to be measured at specific times.