1. Electrical panel will be shifted from west side to south side of B-17 (near activity area) with use of Hydra.
2. Guide ropes will be ensured before lifting/slinging of Electrical Panels.
3. Electrical Panel will be lifted after slinging activity.
2. Electrical Panels and other heavy equipments such as AHU materials having weight capacity of 285Kgs(max) will be shifted to the terrace on the floor level.
3. Later on, Electrical panel will be shifted manually from floor level to - 'on the checker plate'.
3. Same will be positioned as per requirement.
4. The same procedure shall be followed sequetially.
Note: Electrical Panel discription 1). Height - 2500mm.
2). Width - 2300mm. 3). Depth - 500mm.
4). Weight - 1.5 ton(max)