Review the proposed project design and propose revisions, accept or refuse the project design;
Participate in CA negotiations;
Ensure the project is fully defined. Make sure design and construction standards are specified;
Specify any interfaces with other river basin concession holders, payments, compensation, joint operational requirements;
Introduce and specify in the CA requirements for GOL assets such as public roads, irrigation schemes and social infrastructure;