I would like to inform you about Betagen meeting on Oct. 28, 2015 as following.
1. Betagen stated that they had three boilers run two sets and standby one set (capacity 6 ton /hr for each set).
2. Steam condition is temperature 100 °C @ pressure 7 BAR.
3. They have automatic Blow down system, operate by timer.
4. They recovery system for flash steam but not 100%.
5. They need to improve the steam pipe line (Support, Expansion joint and make slope) because they have problem with water condensate in their system.
6. They state that the condensate return had only some point not 100%.
7. After we survey site and wrap up that they need to improve saving energy for Steam system, Electrical system, water system and cooling water system.
8. Betagen need proposal that we have do more than concept design but it is not a detail design for saving energy but they want the detail design for Steam piping system improvement.
8.1 Proposal Stage 1: The detail design for piping system improvement (This stage is relate to structure engineer because it may has support at existing structure)
8.2 Proposal stage 2: The preliminary design for saving energy and improvement system.
Could you please to send the typical proposal of Beca for steam improve system as detail above or likewise for proposal stage 1?
Thanks you very much for your support in advance.