Our Engineer has already checked your drawing which you sent 6 February 2016, and we found that it is still not meet our request.
What we asked is 1 (one) INLET PIPE with 4 (four) left pipe distributor and 4 (four) right pipe distributor as attached drawing (ref: EVAP NBF 900.pdf).
Thank you for your kind attention. We are looking forward to hear from you.
ps: Cilvia is on leave today, therefore I sent this e-mail to you.